234-RAT
Rational Production Facility 

Nächstes Projekt
The new production facility for Rational AG, a leading manufacturer and retailer of commercial and industrial kitchen equipment, marks a significant evolution within the Ackermann architects-designed campus. As the first building on the site to incorporate a two-level production layout, it minimizes land use and reduces the facility’s overall footprint. This innovative approach is supported by a modular structural system: the ground floor features post-tensioned and prefabricated reinforced concrete elements, while the upper level transitions to a lightweight steel structure with the same grid dimensions. Fixed columns provide lateral bracing, ensuring structural stability and allowing for future expansion. A shed roof on the first floor floods the interior with natural light, fostering a comfortable and productive work environment for Rational's employees.
Projekt
Auftraggeber
Formation
Leistungen
Typologie
Partner
Ort
Status
Jahr
Rational Production Facility
Rational AG
Beckh Vorhammer
Tragwerksplanung
Architektur
Ackermann Architekten BDA
Landsberg am Lech (DE)
Laufend
2022–